I-40 EB over Big Lithodendron Wash
GoodNavajo County, Arizona · 10.3 MI E JCT SR 77 · Structure no. 20004
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected June 2023
- Type
- Slab
- Concrete Continuous
- Length
- 470 ft
- 15 main spans
- Daily traffic
- 11,161
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 EB over Big Lithodendron Wash is a concrete continuous slab carrying I-40 EB over Big Lithodendron Wash in Navajo County, Arizona. It was built in 2012, so it is 13 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,161 vehicles a day, roughly 48% of them trucks, projected to reach 11,171 by 2041. The structure is 470 ft (143.3 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 EB over Big Lithodendron Wash built?
It was built in 2012, making it 13 years old in 2025.
What condition is I-40 EB over Big Lithodendron Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does I-40 EB over Big Lithodendron Wash carry?
About 11,161 vehicles per day (2021 count), of which roughly 48% are trucks.
How long is I-40 EB over Big Lithodendron Wash?
The structure is 470 ft (143.3 m) long with a longest span of 32 ft (9.8 m) and a deck 45 ft wide.
Who owns I-40 EB over Big Lithodendron Wash?
It is owned by the State Highway Agency.