I-40 WB over Ruby Wash
GoodNavajo County, Arizona · 3.2 MI W JCT SR 87 · Structure no. 01782
- Built
- 1979
- 46 years old, rebuilt 2014
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 173 ft
- 3 main spans
- Daily traffic
- 11,316
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 WB over Ruby Wash is a prestressed concrete continuous stringer/multi-beam or girder carrying I-40 WB over Ruby Wash in Navajo County, Arizona. It was built in 1979 and reconstructed in 2014, so it is 46 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,316 vehicles a day, roughly 45% of them trucks, projected to reach 11,326 by 2041. The structure is 173 ft (52.7 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 WB over Ruby Wash built?
It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2014.
What condition is I-40 WB over Ruby Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does I-40 WB over Ruby Wash carry?
About 11,316 vehicles per day (2021 count), of which roughly 45% are trucks.
How long is I-40 WB over Ruby Wash?
The structure is 173 ft (52.7 m) long with a longest span of 56 ft (17.1 m) and a deck 45 ft wide.
Who owns I-40 WB over Ruby Wash?
It is owned by the State Highway Agency.