IRR BIA RTE N12 over Wheatfield Creek
GoodNavajo County, Arizona · 17 Miles South of JCT N13 · Structure no. 0000N35780B0504
- Built
- 2022
- 3 years old, rebuilt 9999
- Condition
- Good
- inspected April 2023
- Type
- Culvert
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 2,600
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE N12 over Wheatfield Creek is a prestressed concrete culvert carrying IRR BIA RTE N12 over Wheatfield Creek in Navajo County, Arizona. It was built in 2022 and reconstructed in 9999, so it is 3 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 5% of them trucks, projected to reach 3,000 by 2043. The structure is 58 ft (17.6 m) long and 92 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
No coordinates are recorded for this structure.
Condition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE N12 over Wheatfield Creek built?
It was built in 2022, making it 3 years old in 2025. It was reconstructed in 9999.
What condition is IRR BIA RTE N12 over Wheatfield Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does IRR BIA RTE N12 over Wheatfield Creek carry?
About 2,600 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is IRR BIA RTE N12 over Wheatfield Creek?
The structure is 58 ft (17.6 m) long with a longest span of 58 ft (17.6 m) and a deck 92 ft wide.
Who owns IRR BIA RTE N12 over Wheatfield Creek?
It is owned by the Bureau of Indian Affairs.