Heather Street over Drainage Channel
GoodMohave County, Arizona · 220 Ft SE JCT Locust Blvd · Structure no. 10699
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected April 2024
- Type
- Culvert
- Steel
- Length
- 60 ft
- 6 main spans
- Daily traffic
- 960
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Heather Street over Drainage Channel is a steel culvert carrying Heather Street over Drainage Channel in Mohave County, Arizona. It was built in 2002, so it is 23 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 960 vehicles a day, roughly 1% of them trucks, projected to reach 970 by 2036. The structure is 60 ft (18.3 m) long. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Heather Street over Drainage Channel built?
It was built in 2002, making it 23 years old in 2025.
What condition is Heather Street over Drainage Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Heather Street over Drainage Channel carry?
About 960 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Heather Street over Drainage Channel?
The structure is 60 ft (18.3 m) long with a longest span of 9 ft (2.7 m).
Who owns Heather Street over Drainage Channel?
It is owned by the City or Municipal Highway Agency.