US Bridges

Forest 80 over Crevice

Good

Maricopa County, Arizona · 3.25 N/O Apache Trail · Structure no. 3357

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
98 ft
1 main span
Daily traffic
30
2023 count
Owner
Federal
Bureau of Reclamation

About this bridge

Forest 80 over Crevice is a steel stringer/multi-beam or girder carrying Forest 80 over Crevice in Maricopa County, Arizona. It was built in 2023, so it is 2 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 30 by 2045. The structure is 98 ft (29.9 m) long and 17 ft wide. If it were closed, the detour would be 198.8 mi (320 km).

CarriesForest 80
CrossesCrevice
Location3.25 N/O Apache Trail
RouteFederal Lands Road 25
StateArizona
Coordinates33.57472, -111.35476
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.5 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckOpen grating
Main spans1
Design loadUnknown
Structure length98 ft (29.9 m)
Longest span98 ft (29.9 m)
Deck width17 ft (5.2 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2023)
Projected traffic30 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed198.8 mi (320 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Reclamation
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Forest 80 over Crevice built?

It was built in 2023, making it 2 years old in 2025.

What condition is Forest 80 over Crevice in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Forest 80 over Crevice carry?

About 30 vehicles per day (2023 count).

How long is Forest 80 over Crevice?

The structure is 98 ft (29.9 m) long with a longest span of 98 ft (29.9 m) and a deck 17 ft wide.

Who owns Forest 80 over Crevice?

It is owned by the Bureau of Reclamation and maintained by the Private (other than railroad).