I-I0 over Watson RD
GoodMaricopa County, Arizona · Watson RD & I-10 · Structure no. 20181
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 220 ft
- 2 main spans
- Daily traffic
- 73,548
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-I0 over Watson RD is a concrete continuous stringer/multi-beam or girder carrying I-I0 over Watson RD in Maricopa County, Arizona. It was built in 2023, so it is 2 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 73,548 vehicles a day, roughly 22% of them trucks, projected to reach 73,558 by 2041. The structure is 220 ft (67.1 m) long and 159 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-I0 over Watson RD built?
It was built in 2023, making it 2 years old in 2025.
What condition is I-I0 over Watson RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does I-I0 over Watson RD carry?
About 73,548 vehicles per day (2021 count), of which roughly 22% are trucks.
How long is I-I0 over Watson RD?
The structure is 220 ft (67.1 m) long with a longest span of 107 ft (32.6 m) and a deck 159 ft wide.
Who owns I-I0 over Watson RD?
It is owned by the State Highway Agency.