US Bridges

WB SR202L S Mntn over Salt River

Good

Maricopa County, Arizona · 4.7 MI S. I-10/ Smf Ti · Structure no. 20140

Built
2019
6 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
2,660 ft
16 main spans
Daily traffic
33,933
2023 count
Owner
State
State Highway Agency

About this bridge

WB SR202L S Mntn over Salt River is a prestressed concrete continuous stringer/multi-beam or girder carrying WB SR202L S Mntn over Salt River in Maricopa County, Arizona. It was built in 2019, so it is 6 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,933 vehicles a day, roughly 18% of them trucks, projected to reach 33,943 by 2042. The structure is 2,660 ft (810.8 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB SR202L S Mntn
CrossesSalt River
Location4.7 MI S. I-10/ Smf Ti
RouteState Highway 202
StateArizona
Coordinates33.3957, -112.1919
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans16
Design loadHL 93
Structure length2,660 ft (810.8 m)
Longest span170 ft (51.8 m)
Deck width85 ft (26 m)
Roadway width82 ft (25 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,933 (2023)
Projected traffic33,943 by 2042
Trucks18%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was WB SR202L S Mntn over Salt River built?

It was built in 2019, making it 6 years old in 2025.

What condition is WB SR202L S Mntn over Salt River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does WB SR202L S Mntn over Salt River carry?

About 33,933 vehicles per day (2023 count), of which roughly 18% are trucks.

How long is WB SR202L S Mntn over Salt River?

The structure is 2,660 ft (810.8 m) long with a longest span of 170 ft (51.8 m) and a deck 85 ft wide.

Who owns WB SR202L S Mntn over Salt River?

It is owned by the State Highway Agency.