US Bridges

Fairway DR over I-10

Good

Maricopa County, Arizona · 3.25MI W of Jnc 101L · Structure no. 20051

Built
2020
5 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
235 ft
2 main spans
Daily traffic
1,010
2024 count
Owner
State
State Highway Agency

About this bridge

Fairway DR over I-10 is a prestressed concrete continuous stringer/multi-beam or girder carrying Fairway DR over I-10 in Maricopa County, Arizona. It was built in 2020, so it is 5 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,010 vehicles a day, roughly 2% of them trucks, projected to reach 1,020 by 2042. The structure is 235 ft (71.6 m) long and 63 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFairway DR
CrossesI-10
Location3.25MI W of Jnc 101L
RouteCity Street 0
StateArizona
Coordinates33.4575, -112.3239
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating57 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length235 ft (71.6 m)
Longest span115 ft (35.1 m)
Deck width63 ft (19.1 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,010 (2024)
Projected traffic1,020 by 2042
Trucks2%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fairway DR over I-10 built?

It was built in 2020, making it 5 years old in 2025.

What condition is Fairway DR over I-10 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Fairway DR over I-10 carry?

About 1,010 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is Fairway DR over I-10?

The structure is 235 ft (71.6 m) long with a longest span of 115 ft (35.1 m) and a deck 63 ft wide.

Who owns Fairway DR over I-10?

It is owned by the State Highway Agency.