US Bridges

Peak View Road over Wash

Good

Maricopa County, Arizona · 0.31 M/W of 299th Ave · Structure no. 11713

Built
1990
35 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete Continuous
Length
32 ft
3 main spans
Daily traffic
730
2023 count
Owner
County
County Highway Agency

About this bridge

Peak View Road over Wash is a concrete continuous culvert carrying Peak View Road over Wash in Maricopa County, Arizona. It was built in 1990, so it is 35 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 730 vehicles a day, roughly 5% of them trucks, projected to reach 740 by 2042. The structure is 32 ft (9.8 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPeak View Road
CrossesWash
Location0.31 M/W of 299th Ave
RouteCounty Highway 0
StateArizona
Coordinates33.746, -112.7129
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 36 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.9 US tons
Inventory rating46.6 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic730 (2023)
Projected traffic740 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peak View Road over Wash built?

It was built in 1990, making it 35 years old in 2025.

What condition is Peak View Road over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Peak View Road over Wash carry?

About 730 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Peak View Road over Wash?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 28 ft wide.

Who owns Peak View Road over Wash?

It is owned by the County Highway Agency.