US Bridges

Deer Valley Road over Dry Wash

Good

Maricopa County, Arizona · 600 Ft W of Sky Crss Way · Structure no. 11682

Built
2018
7 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete Continuous
Length
22 ft
2 main spans
Daily traffic
15,827
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Deer Valley Road over Dry Wash is a concrete continuous culvert carrying Deer Valley Road over Dry Wash in Maricopa County, Arizona. It was built in 2018, so it is 7 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,827 vehicles a day, roughly 5% of them trucks, projected to reach 15,837 by 2042. The structure is 22 ft (6.7 m) long.

CarriesDeer Valley Road
CrossesDry Wash
Location600 Ft W of Sky Crss Way
RouteCity Street 0_
StateArizona
Coordinates33.6869, -112.0242
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length22 ft (6.7 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,827 (2023)
Projected traffic15,837 by 2042
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Deer Valley Road over Dry Wash built?

It was built in 2018, making it 7 years old in 2025.

What condition is Deer Valley Road over Dry Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Deer Valley Road over Dry Wash carry?

About 15,827 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Deer Valley Road over Dry Wash?

The structure is 22 ft (6.7 m) long with a longest span of 11 ft (3.4 m).

Who owns Deer Valley Road over Dry Wash?

It is owned by the City or Municipal Highway Agency.