US Bridges

Cactus RD over Channel

Good

Maricopa County, Arizona · 200 W of 93rd ST · Structure no. 11228

Built
2009
16 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete Continuous
Length
26 ft
3 main spans
Daily traffic
28,600
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cactus RD over Channel is a concrete continuous culvert carrying Cactus RD over Channel in Maricopa County, Arizona. It was built in 2009, so it is 16 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,600 vehicles a day, roughly 2% of them trucks, projected to reach 28,610 by 2038. The structure is 26 ft (7.9 m) long.

Location

No coordinates are recorded for this structure.

CarriesCactus RD
CrossesChannel
Location200 W of 93rd ST
RouteCity Street 0
StateArizona
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating82 US tons
Inventory rating49.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,600 (2018)
Projected traffic28,610 by 2038
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cactus RD over Channel built?

It was built in 2009, making it 16 years old in 2025.

What condition is Cactus RD over Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Cactus RD over Channel carry?

About 28,600 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Cactus RD over Channel?

The structure is 26 ft (7.9 m) long with a longest span of 8 ft (2.4 m).

Who owns Cactus RD over Channel?

It is owned by the City or Municipal Highway Agency.