US Bridges

Chauncey Lane over Drainage Channel

Good

Maricopa County, Arizona · East of 68th Street · Structure no. 11184

Built
2006
19 years old
Condition
Good
inspected December 2020
Type
Culvert
Concrete Continuous
Length
43 ft
4 main spans
Daily traffic
3,099
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Chauncey Lane over Drainage Channel is a concrete continuous culvert carrying Chauncey Lane over Drainage Channel in Maricopa County, Arizona. It was built in 2006, so it is 19 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,099 vehicles a day, roughly 1% of them trucks, projected to reach 3,109 by 2034. The structure is 43 ft (13.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesChauncey Lane
CrossesDrainage Channel
LocationEast of 68th Street
RouteCity Street 0
StateArizona
Coordinates33.6516, -111.9339
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2020
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating100.8 US tons
Inventory rating60.4 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadHS 20
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,099 (2014)
Projected traffic3,109 by 2034
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chauncey Lane over Drainage Channel built?

It was built in 2006, making it 19 years old in 2025.

What condition is Chauncey Lane over Drainage Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2020.

How much traffic does Chauncey Lane over Drainage Channel carry?

About 3,099 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Chauncey Lane over Drainage Channel?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m).

Who owns Chauncey Lane over Drainage Channel?

It is owned by the City or Municipal Highway Agency.