Northern Parkway over Litchfield RD
GoodMaricopa County, Arizona · 2.0 MI E JCT Reems RD · Structure no. 11163
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 189 ft
- 2 main spans
- Daily traffic
- 20,721
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Northern Parkway over Litchfield RD is a prestressed concrete continuous box beam or girders - multiple carrying Northern Parkway over Litchfield RD in Maricopa County, Arizona. It was built in 2014, so it is 11 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,721 vehicles a day, roughly 10% of them trucks, projected to reach 20,731 by 2042. The structure is 189 ft (57.6 m) long and 125 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northern Parkway over Litchfield RD built?
It was built in 2014, making it 11 years old in 2025.
What condition is Northern Parkway over Litchfield RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Northern Parkway over Litchfield RD carry?
About 20,721 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Northern Parkway over Litchfield RD?
The structure is 189 ft (57.6 m) long with a longest span of 92 ft (28 m) and a deck 125 ft wide.
Who owns Northern Parkway over Litchfield RD?
It is owned by the City or Municipal Highway Agency.