Northern Parkway over Sarival Avenue
GoodMaricopa County, Arizona · 1.0 MI W JCT Reems RD · Structure no. 11160
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 203 ft
- 2 main spans
- Daily traffic
- 9,251
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Northern Parkway over Sarival Avenue is a prestressed concrete continuous stringer/multi-beam or girder carrying Northern Parkway over Sarival Avenue in Maricopa County, Arizona. It was built in 2013, so it is 12 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,251 vehicles a day, roughly 10% of them trucks, projected to reach 9,261 by 2042. The structure is 203 ft (61.9 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northern Parkway over Sarival Avenue built?
It was built in 2013, making it 12 years old in 2025.
What condition is Northern Parkway over Sarival Avenue in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Northern Parkway over Sarival Avenue carry?
About 9,251 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Northern Parkway over Sarival Avenue?
The structure is 203 ft (61.9 m) long with a longest span of 106 ft (32.3 m) and a deck 49 ft wide.
Who owns Northern Parkway over Sarival Avenue?
It is owned by the City or Municipal Highway Agency.