US Bridges

Tegner ST over Sols Wash

Good

Maricopa County, Arizona · 0.2 MI N JCT SR 60 · Structure no. 11134

Built
1999
26 years old
Condition
Good
inspected November 2023
Type
Slab
Concrete Continuous
Length
226 ft
6 main spans
Daily traffic
1,710
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Tegner ST over Sols Wash is a concrete continuous slab carrying Tegner ST over Sols Wash in Maricopa County, Arizona. It was built in 1999, so it is 26 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,710 vehicles a day, roughly 5% of them trucks, projected to reach 1,720 by 2042. The structure is 226 ft (68.9 m) long and 92 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTegner ST
CrossesSols Wash
Location0.2 MI N JCT SR 60
RouteCity Street 0
StateArizona
Coordinates33.9729, -112.7343
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating52 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length226 ft (68.9 m)
Longest span37 ft (11.3 m)
Deck width92 ft (28 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,710 (2022)
Projected traffic1,720 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tegner ST over Sols Wash built?

It was built in 1999, making it 26 years old in 2025.

What condition is Tegner ST over Sols Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Tegner ST over Sols Wash carry?

About 1,710 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Tegner ST over Sols Wash?

The structure is 226 ft (68.9 m) long with a longest span of 37 ft (11.3 m) and a deck 92 ft wide.

Who owns Tegner ST over Sols Wash?

It is owned by the Town or Township Highway Agency.