US Bridges

Wayland Drive over Drainage Channel

Good

Maricopa County, Arizona · 0.02 MI E of 35th Ave · Structure no. 11120

Built
2004
21 years old
Condition
Good
inspected February 2021
Type
Culvert
Concrete Continuous
Length
56 ft
5 main spans
Daily traffic
500
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Wayland Drive over Drainage Channel is a concrete continuous culvert carrying Wayland Drive over Drainage Channel in Maricopa County, Arizona. It was built in 2004, so it is 21 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 1% of them trucks, projected to reach 510 by 2041. The structure is 56 ft (17.1 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesWayland Drive
CrossesDrainage Channel
Location0.02 MI E of 35th Ave
RouteCity Street 0
StateArizona
Coordinates33.3946, -112.1333
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating80.1 US tons
Inventory rating48 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length56 ft (17.1 m)
Longest span10 ft (3 m)
Deck width56 ft (17.1 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2021)
Projected traffic510 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wayland Drive over Drainage Channel built?

It was built in 2004, making it 21 years old in 2025.

What condition is Wayland Drive over Drainage Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does Wayland Drive over Drainage Channel carry?

About 500 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Wayland Drive over Drainage Channel?

The structure is 56 ft (17.1 m) long with a longest span of 10 ft (3 m) and a deck 56 ft wide.

Who owns Wayland Drive over Drainage Channel?

It is owned by the City or Municipal Highway Agency.