US Bridges

Power RD NB over Rwcd

Good

Maricopa County, Arizona · _ · Structure no. 11068

Built
2020
5 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
114 ft
1 main span
Daily traffic
15,020
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Power RD NB over Rwcd is a prestressed concrete box beam or girders - multiple carrying Power RD NB over Rwcd in Maricopa County, Arizona. It was built in 2020, so it is 5 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,020 vehicles a day, roughly 5% of them trucks, projected to reach 15,030 by 2042. The structure is 114 ft (34.7 m) long and 53 ft wide.

CarriesPower RD NB
CrossesRwcd
Location_
RouteCity Street 0
StateArizona
Coordinates33.3106, -111.6869
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length114 ft (34.7 m)
Longest span105 ft (32 m)
Deck width53 ft (16.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic15,020 (2023)
Projected traffic15,030 by 2042
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Power RD NB over Rwcd built?

It was built in 2020, making it 5 years old in 2025.

What condition is Power RD NB over Rwcd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Power RD NB over Rwcd carry?

About 15,020 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Power RD NB over Rwcd?

The structure is 114 ft (34.7 m) long with a longest span of 105 ft (32 m) and a deck 53 ft wide.

Who owns Power RD NB over Rwcd?

It is owned by the City or Municipal Highway Agency.