US Bridges

Quail Ave over Drainage Basin

Good

Maricopa County, Arizona · @ JCT W/ 98th Ave · Structure no. 10961

Built
2007
18 years old
Condition
Good
inspected May 2022
Type
Culvert
Concrete Continuous
Length
34 ft
4 main spans
Daily traffic
500
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Quail Ave over Drainage Basin is a concrete continuous culvert carrying Quail Ave over Drainage Basin in Maricopa County, Arizona. It was built in 2007, so it is 18 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 1% of them trucks, projected to reach 510 by 2038. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesQuail Ave
CrossesDrainage Basin
Location@ JCT W/ 98th Ave
RouteCity Street 0
StateArizona
Coordinates33.6773, -112.2707
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2018)
Projected traffic510 by 2038
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Quail Ave over Drainage Basin built?

It was built in 2007, making it 18 years old in 2025.

What condition is Quail Ave over Drainage Basin in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does Quail Ave over Drainage Basin carry?

About 500 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Quail Ave over Drainage Basin?

The structure is 34 ft (10.4 m) long with a longest span of 8 ft (2.4 m).

Who owns Quail Ave over Drainage Basin?

It is owned by the City or Municipal Highway Agency.