US Bridges

Cibola Vista DR over Wash

Good

Maricopa County, Arizona · 0.5 MI E JCT Lp Pkwy · Structure no. 10911

Built
2004
21 years old
Condition
Good
inspected April 2022
Type
Culvert
Concrete Continuous
Length
88 ft
6 main spans
Daily traffic
502
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cibola Vista DR over Wash is a concrete continuous culvert carrying Cibola Vista DR over Wash in Maricopa County, Arizona. It was built in 2004, so it is 21 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 502 vehicles a day, roughly 1% of them trucks, projected to reach 512 by 2041. The structure is 88 ft (26.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCibola Vista DR
CrossesWash
Location0.5 MI E JCT Lp Pkwy
RouteCity Street 0
StateArizona
Coordinates33.7283, -112.2609
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans6
Design loadHS 20
Structure length88 ft (26.8 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic502 (2021)
Projected traffic512 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cibola Vista DR over Wash built?

It was built in 2004, making it 21 years old in 2025.

What condition is Cibola Vista DR over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does Cibola Vista DR over Wash carry?

About 502 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Cibola Vista DR over Wash?

The structure is 88 ft (26.8 m) long with a longest span of 14 ft (4.3 m).

Who owns Cibola Vista DR over Wash?

It is owned by the City or Municipal Highway Agency.