Circle Mountain RD over Dry Wash
GoodMaricopa County, Arizona · 0.07 MI E of 50th Avenue · Structure no. 10882
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected January 2021
- Type
- Culvert
- Concrete
- Length
- 44 ft
- 4 main spans
- Daily traffic
- 500
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Circle Mountain RD over Dry Wash is a concrete culvert carrying Circle Mountain RD over Dry Wash in Maricopa County, Arizona. It was built in 2009, so it is 16 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, roughly 1% of them trucks, projected to reach 510 by 2040. The structure is 44 ft (13.4 m) long. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Circle Mountain RD over Dry Wash built?
It was built in 2009, making it 16 years old in 2025.
What condition is Circle Mountain RD over Dry Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2021.
How much traffic does Circle Mountain RD over Dry Wash carry?
About 500 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Circle Mountain RD over Dry Wash?
The structure is 44 ft (13.4 m) long with a longest span of 10 ft (3 m).
Who owns Circle Mountain RD over Dry Wash?
It is owned by the City or Municipal Highway Agency.