US Bridges

83rd Ave over Bethany Home Outfall Chn

Good

Maricopa County, Arizona · 100 N JCT Bethany Hm RD · Structure no. 10829

Built
2002
23 years old
Condition
Good
inspected May 2024
Type
Slab
Concrete Continuous
Length
150 ft
3 main spans
Daily traffic
20,295
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

83rd Ave over Bethany Home Outfall Chn is a concrete continuous slab carrying 83rd Ave over Bethany Home Outfall Chn in Maricopa County, Arizona. It was built in 2002, so it is 23 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,295 vehicles a day, roughly 5% of them trucks, projected to reach 20,305 by 2042. The structure is 150 ft (45.7 m) long and 107 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries83rd Ave
CrossesBethany Home Outfall Chn
Location100 N JCT Bethany Hm RD
RouteCity Street 0
StateArizona
Coordinates33.5227, -112.2376
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating65 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span49 ft (14.9 m)
Deck width107 ft (32.5 m)
Roadway width90 ft (27.4 m)
Vertical clearance over deck40 ft (12.2 m)

Traffic and service

Average daily traffic20,295 (2024)
Projected traffic20,305 by 2042
Trucks5%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 83rd Ave over Bethany Home Outfall Chn built?

It was built in 2002, making it 23 years old in 2025.

What condition is 83rd Ave over Bethany Home Outfall Chn in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does 83rd Ave over Bethany Home Outfall Chn carry?

About 20,295 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is 83rd Ave over Bethany Home Outfall Chn?

The structure is 150 ft (45.7 m) long with a longest span of 49 ft (14.9 m) and a deck 107 ft wide.

Who owns 83rd Ave over Bethany Home Outfall Chn?

It is owned by the City or Municipal Highway Agency.