North Foothills DR over Dry Wash
GoodMaricopa County, Arizona · 300 Ft E/O N Valley Pkwy · Structure no. 10651
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected February 2023
- Type
- Culvert
- Concrete Continuous
- Length
- 34 ft
- 3 main spans
- Daily traffic
- 1,000
- 2007 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
North Foothills DR over Dry Wash is a concrete continuous culvert carrying North Foothills DR over Dry Wash in Maricopa County, Arizona. It was built in 2006, so it is 19 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 1,200 by 2030. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Foothills DR over Dry Wash built?
It was built in 2006, making it 19 years old in 2025.
What condition is North Foothills DR over Dry Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does North Foothills DR over Dry Wash carry?
About 1,000 vehicles per day (2007 count), of which roughly 1% are trucks.
How long is North Foothills DR over Dry Wash?
The structure is 34 ft (10.4 m) long with a longest span of 8 ft (2.4 m).
Who owns North Foothills DR over Dry Wash?
It is owned by the City or Municipal Highway Agency.