US Bridges

Ridgeline Road over White Peak Wash & Ped

Good

Maricopa County, Arizona · 0.07 MI W of 122nd DR · Structure no. 10611

Built
2006
19 years old
Condition
Good
inspected April 2022
Type
Culvert
Concrete Continuous
Length
30 ft
2 main spans
Daily traffic
1,294
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ridgeline Road over White Peak Wash & Ped is a concrete continuous culvert carrying Ridgeline Road over White Peak Wash & Ped in Maricopa County, Arizona. It was built in 2006, so it is 19 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,294 vehicles a day, roughly 1% of them trucks, projected to reach 1,304 by 2036. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRidgeline Road
CrossesWhite Peak Wash & Ped
Location0.07 MI W of 122nd DR
RouteCity Street 0
StateArizona
Coordinates33.751, -112.3249
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating86 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,294 (2016)
Projected traffic1,304 by 2036
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ridgeline Road over White Peak Wash & Ped built?

It was built in 2006, making it 19 years old in 2025.

What condition is Ridgeline Road over White Peak Wash & Ped in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does Ridgeline Road over White Peak Wash & Ped carry?

About 1,294 vehicles per day (2016 count), of which roughly 1% are trucks.

How long is Ridgeline Road over White Peak Wash & Ped?

The structure is 30 ft (9.1 m) long with a longest span of 14 ft (4.3 m).

Who owns Ridgeline Road over White Peak Wash & Ped?

It is owned by the City or Municipal Highway Agency.