US Bridges

Vistancia Blvd over Wash

Good

Maricopa County, Arizona · 0.75 MI Se/ El Mirage RD · Structure no. 10439

Built
2003
22 years old
Condition
Good
inspected April 2022
Type
Culvert
Concrete Continuous
Length
45 ft
4 main spans
Daily traffic
8,182
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Vistancia Blvd over Wash is a concrete continuous culvert carrying Vistancia Blvd over Wash in Maricopa County, Arizona. It was built in 2003, so it is 22 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,182 vehicles a day, roughly 2% of them trucks, projected to reach 8,192 by 2037. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesVistancia Blvd
CrossesWash
Location0.75 MI Se/ El Mirage RD
RouteCity Street 0
StateArizona
Coordinates33.7365, -112.3179
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadHS 20
Structure length45 ft (13.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,182 (2017)
Projected traffic8,192 by 2037
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Vistancia Blvd over Wash built?

It was built in 2003, making it 22 years old in 2025.

What condition is Vistancia Blvd over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does Vistancia Blvd over Wash carry?

About 8,182 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Vistancia Blvd over Wash?

The structure is 45 ft (13.7 m) long with a longest span of 10 ft (3 m).

Who owns Vistancia Blvd over Wash?

It is owned by the City or Municipal Highway Agency.