I-17 Frontage RD over New River
GoodMaricopa County, Arizona · 0.2 MI S/ New River RD · Structure no. 10085
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 401 ft
- 5 main spans
- Daily traffic
- 2,454
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
I-17 Frontage RD over New River is a prestressed concrete continuous stringer/multi-beam or girder carrying I-17 Frontage RD over New River in Maricopa County, Arizona. It was built in 1997, so it is 28 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,454 vehicles a day, roughly 5% of them trucks, projected to reach 2,464 by 2040. The structure is 401 ft (122.2 m) long and 69 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-17 Frontage RD over New River built?
It was built in 1997, making it 28 years old in 2025.
What condition is I-17 Frontage RD over New River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does I-17 Frontage RD over New River carry?
About 2,454 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is I-17 Frontage RD over New River?
The structure is 401 ft (122.2 m) long with a longest span of 80 ft (24.4 m) and a deck 69 ft wide.
Who owns I-17 Frontage RD over New River?
It is owned by the County Highway Agency.