US Bridges

Wildwood Drive over Drainage Ditch

Good

Maricopa County, Arizona · 200 W/ 125th Ave · Structure no. 08577

Built
1979
46 years old, rebuilt 2023
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
500
2023 count
Owner
County
County Highway Agency

About this bridge

Wildwood Drive over Drainage Ditch is a concrete culvert carrying Wildwood Drive over Drainage Ditch in Maricopa County, Arizona. It was built in 1979 and reconstructed in 2023, so it is 46 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, projected to reach 510 by 2042. The structure is 22 ft (6.7 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWildwood Drive
CrossesDrainage Ditch
Location200 W/ 125th Ave
RouteCounty Highway 0
StateArizona
Coordinates33.63958, -112.33004
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 36 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating42.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width44 ft (13.4 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2023)
Projected traffic510 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wildwood Drive over Drainage Ditch built?

It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2023.

What condition is Wildwood Drive over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Wildwood Drive over Drainage Ditch carry?

About 500 vehicles per day (2023 count).

How long is Wildwood Drive over Drainage Ditch?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 44 ft wide.

Who owns Wildwood Drive over Drainage Ditch?

It is owned by the County Highway Agency.