Greenway Parkway over Dry Wash
GoodMaricopa County, Arizona · 0.1 MI E of 3rd Ave · Structure no. 07604
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected November 2021
- Type
- Culvert
- Concrete Continuous
- Length
- 23 ft
- 2 main spans
- Daily traffic
- 30,012
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Greenway Parkway over Dry Wash is a concrete continuous culvert carrying Greenway Parkway over Dry Wash in Maricopa County, Arizona. It was built in 1988, so it is 37 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30,012 vehicles a day, roughly 1% of them trucks, projected to reach 31,012 by 2041. The structure is 23 ft (7 m) long and 110 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenway Parkway over Dry Wash built?
It was built in 1988, making it 37 years old in 2025.
What condition is Greenway Parkway over Dry Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.
How much traffic does Greenway Parkway over Dry Wash carry?
About 30,012 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Greenway Parkway over Dry Wash?
The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m) and a deck 110 ft wide.
Who owns Greenway Parkway over Dry Wash?
It is owned by the City or Municipal Highway Agency.