US Bridges

Capt Dreyfus ST over Drain Channel

Good

Maricopa County, Arizona · W of JCT 91st Way · Structure no. 07502

Built
1985
40 years old
Condition
Good
inspected February 2022
Type
Culvert
Concrete Continuous
Length
21 ft
2 main spans
Daily traffic
150
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Capt Dreyfus ST over Drain Channel is a concrete continuous culvert carrying Capt Dreyfus ST over Drain Channel in Maricopa County, Arizona. It was built in 1985, so it is 40 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, projected to reach 160 by 2040. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCapt Dreyfus ST
CrossesDrain Channel
LocationW of JCT 91st Way
RouteCity Street 0
StateArizona
Coordinates33.6048, -111.8834
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating58 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2020)
Projected traffic160 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Capt Dreyfus ST over Drain Channel built?

It was built in 1985, making it 40 years old in 2025.

What condition is Capt Dreyfus ST over Drain Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.

How much traffic does Capt Dreyfus ST over Drain Channel carry?

About 150 vehicles per day (2020 count).

How long is Capt Dreyfus ST over Drain Channel?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).

Who owns Capt Dreyfus ST over Drain Channel?

It is owned by the City or Municipal Highway Agency.