US Bridges

Dirt Service Road over Las Sendas Channel

Good

Maricopa County, Arizona · 600 Ft NE 202L/ Mcdowell · Structure no. 07187

Built
2008
17 years old
Condition
Good
inspected November 2021
Type
Culvert
Concrete Continuous
Length
54 ft
4 main spans
Daily traffic
20
2021 count
Owner
State
State Highway Agency

About this bridge

Dirt Service Road over Las Sendas Channel is a concrete continuous culvert carrying Dirt Service Road over Las Sendas Channel in Maricopa County, Arizona. It was built in 2008, so it is 17 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, projected to reach 30 by 2041. The structure is 54 ft (16.5 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDirt Service Road
CrossesLas Sendas Channel
Location600 Ft NE 202L/ Mcdowell
RouteState Highway 202
StateArizona
Coordinates33.467, -111.6778
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length54 ft (16.5 m)
Longest span12 ft (3.7 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2021)
Projected traffic30 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dirt Service Road over Las Sendas Channel built?

It was built in 2008, making it 17 years old in 2025.

What condition is Dirt Service Road over Las Sendas Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.

How much traffic does Dirt Service Road over Las Sendas Channel carry?

About 20 vehicles per day (2021 count).

How long is Dirt Service Road over Las Sendas Channel?

The structure is 54 ft (16.5 m) long with a longest span of 12 ft (3.7 m) and a deck 25 ft wide.

Who owns Dirt Service Road over Las Sendas Channel?

It is owned by the State Highway Agency.