US Bridges

202L over E Channel - 202L

Good

Maricopa County, Arizona · 247 E of 202L/GUADALUPE · Structure no. 07135

Built
2007
18 years old
Condition
Good
inspected November 2021
Type
Culvert
Concrete Continuous
Length
27 ft
3 main spans
Daily traffic
20,447
2020 count
Owner
State
State Highway Agency

About this bridge

202L over E Channel - 202L is a concrete continuous culvert carrying 202L over E Channel - 202L in Maricopa County, Arizona. It was built in 2007, so it is 18 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,447 vehicles a day, roughly 5% of them trucks, projected to reach 20,457 by 2040. The structure is 27 ft (8.2 m) long and 228 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries202L
CrossesE Channel - 202L
Location247 E of 202L/GUADALUPE
RouteCity Street 202
StateArizona
Coordinates33.3647, -111.6431
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span8 ft (2.4 m)
Deck width228 ft (69.5 m)
Roadway width78 ft (23.8 m)
Vertical clearance over deck20 ft (6.1 m)

Traffic and service

Average daily traffic20,447 (2020)
Projected traffic20,457 by 2040
Trucks5%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 202L over E Channel - 202L built?

It was built in 2007, making it 18 years old in 2025.

What condition is 202L over E Channel - 202L in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.

How much traffic does 202L over E Channel - 202L carry?

About 20,447 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is 202L over E Channel - 202L?

The structure is 27 ft (8.2 m) long with a longest span of 8 ft (2.4 m) and a deck 228 ft wide.

Who owns 202L over E Channel - 202L?

It is owned by the State Highway Agency.