Road to Landfill over Wash
GoodMaricopa County, Arizona · Mcdowell / N Mesa DR · Structure no. 07001
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected April 2023
- Type
- Culvert
- Concrete Continuous
- Length
- 26 ft
- 3 main spans
- Daily traffic
- 10
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Road to Landfill over Wash is a concrete continuous culvert carrying Road to Landfill over Wash in Maricopa County, Arizona. It was built in 1998, so it is 27 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10 vehicles a day, roughly 1% of them trucks, projected to reach 20 by 2042. The structure is 26 ft (7.9 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Road to Landfill over Wash built?
It was built in 1998, making it 27 years old in 2025.
What condition is Road to Landfill over Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Road to Landfill over Wash carry?
About 10 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Road to Landfill over Wash?
The structure is 26 ft (7.9 m) long with a longest span of 8 ft (2.4 m) and a deck 50 ft wide.
Who owns Road to Landfill over Wash?
It is owned by the State Highway Agency.