US Bridges

I 8; WB over Wash

Good

Maricopa County, Arizona · 26.9 MI E JCT SR 85 · Structure no. 05298

Built
1959
66 years old, rebuilt 1980
Condition
Good
inspected January 2023
Type
Culvert
Concrete Continuous
Length
65 ft
6 main spans
Daily traffic
3,373
2021 count
Owner
State
State Highway Agency

About this bridge

I 8; WB over Wash is a concrete continuous culvert carrying I 8; WB over Wash in Maricopa County, Arizona. It was built in 1959 and reconstructed in 1980, so it is 66 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,373 vehicles a day, roughly 42% of them trucks, projected to reach 3,383 by 2041. The structure is 65 ft (19.8 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 8; WB
CrossesWash
Location26.9 MI E JCT SR 85
RouteInterstate 8
StateArizona
Coordinates32.8463, -112.2897
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length65 ft (19.8 m)
Longest span10 ft (3 m)
Deck width46 ft (14 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,373 (2021)
Projected traffic3,383 by 2041
Trucks42%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 8; WB over Wash built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1980.

What condition is I 8; WB over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does I 8; WB over Wash carry?

About 3,373 vehicles per day (2021 count), of which roughly 42% are trucks.

How long is I 8; WB over Wash?

The structure is 65 ft (19.8 m) long with a longest span of 10 ft (3 m) and a deck 46 ft wide.

Who owns I 8; WB over Wash?

It is owned by the State Highway Agency.