Grand Canal over W Cnl Br Crossover
GoodMaricopa County, Arizona · 103 N of Bethany Home RD · Structure no. 02972
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 43 ft
- 1 main span
- Daily traffic
- 10
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Grand Canal over W Cnl Br Crossover is a prestressed concrete box beam or girders - multiple carrying Grand Canal over W Cnl Br Crossover in Maricopa County, Arizona. It was built in 2008, so it is 17 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10 vehicles a day, projected to reach 20 by 2042. The structure is 43 ft (13.1 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grand Canal over W Cnl Br Crossover built?
It was built in 2008, making it 17 years old in 2025.
What condition is Grand Canal over W Cnl Br Crossover in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Grand Canal over W Cnl Br Crossover carry?
About 10 vehicles per day (2024 count).
How long is Grand Canal over W Cnl Br Crossover?
The structure is 43 ft (13.1 m) long with a longest span of 38 ft (11.6 m) and a deck 51 ft wide.
Who owns Grand Canal over W Cnl Br Crossover?
It is owned by the State Highway Agency.