US Bridges

Grand Canal over W Cnl Br Crossover

Good

Maricopa County, Arizona · 130 N Bethany Home RD · Structure no. 02971

Built
2008
17 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
43 ft
1 main span
Daily traffic
10
2024 count
Owner
State
State Highway Agency

About this bridge

Grand Canal over W Cnl Br Crossover is a prestressed concrete box beam or girders - multiple carrying Grand Canal over W Cnl Br Crossover in Maricopa County, Arizona. It was built in 2008, so it is 17 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 20 by 2042. The structure is 43 ft (13.1 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGrand Canal
CrossesW Cnl Br Crossover
Location130 N Bethany Home RD
RouteState Highway 101
StateArizona
Coordinates33.523, -112.2698
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length43 ft (13.1 m)
Longest span38 ft (11.6 m)
Deck width51 ft (15.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2024)
Projected traffic20 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Grand Canal over W Cnl Br Crossover built?

It was built in 2008, making it 17 years old in 2025.

What condition is Grand Canal over W Cnl Br Crossover in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Grand Canal over W Cnl Br Crossover carry?

About 10 vehicles per day (2024 count).

How long is Grand Canal over W Cnl Br Crossover?

The structure is 43 ft (13.1 m) long with a longest span of 38 ft (11.6 m) and a deck 51 ft wide.

Who owns Grand Canal over W Cnl Br Crossover?

It is owned by the State Highway Agency.