US Bridges

Ramp to SR 202L over Railroad

Good

Maricopa County, Arizona · Arizona Av & L202 Chndler · Structure no. 02676

Built
2005
20 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
108 ft
1 main span
Daily traffic
15,725
2019 count
Owner
State
State Highway Agency

About this bridge

Ramp to SR 202L over Railroad is a prestressed concrete stringer/multi-beam or girder carrying Ramp to SR 202L over Railroad in Maricopa County, Arizona. It was built in 2005, so it is 20 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,725 vehicles a day, roughly 5% of them trucks, projected to reach 15,735 by 2039. The structure is 108 ft (32.9 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp to SR 202L
CrossesRailroad
LocationArizona Av & L202 Chndler
RouteState Highway 202
StateArizona
Coordinates33.2872, -111.8371
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length108 ft (32.9 m)
Longest span102 ft (31.1 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck25 ft (7.6 m)

Traffic and service

Average daily traffic15,725 (2019)
Projected traffic15,735 by 2039
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to SR 202L over Railroad built?

It was built in 2005, making it 20 years old in 2025.

What condition is Ramp to SR 202L over Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Ramp to SR 202L over Railroad carry?

About 15,725 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Ramp to SR 202L over Railroad?

The structure is 108 ft (32.9 m) long with a longest span of 102 ft (31.1 m) and a deck 29 ft wide.

Who owns Ramp to SR 202L over Railroad?

It is owned by the State Highway Agency.