US Bridges

Ramp E-N over SR 202L Ramps a B

Good

Maricopa County, Arizona · 0.25 MI W of L101/L202 · Structure no. 02616

Built
2004
21 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
639 ft
4 main spans
Daily traffic
17,921
2023 count
Owner
State
State Highway Agency

About this bridge

Ramp E-N over SR 202L Ramps a B is a prestressed concrete continuous box beam or girders - single or spread carrying Ramp E-N over SR 202L Ramps a B in Maricopa County, Arizona. It was built in 2004, so it is 21 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,921 vehicles a day, roughly 7% of them trucks, projected to reach 17,931 by 2042. The structure is 639 ft (194.8 m) long and 31 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesRamp E-N
CrossesSR 202L Ramps a B
Location0.25 MI W of L101/L202
RouteState Highway 101
StateArizona
Coordinates33.2917, -111.8965
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.9 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length639 ft (194.8 m)
Longest span189 ft (57.6 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,921 (2023)
Projected traffic17,931 by 2042
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp E-N over SR 202L Ramps a B built?

It was built in 2004, making it 21 years old in 2025.

What condition is Ramp E-N over SR 202L Ramps a B in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Ramp E-N over SR 202L Ramps a B carry?

About 17,921 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is Ramp E-N over SR 202L Ramps a B?

The structure is 639 ft (194.8 m) long with a longest span of 189 ft (57.6 m) and a deck 31 ft wide.

Who owns Ramp E-N over SR 202L Ramps a B?

It is owned by the State Highway Agency.