US Bridges

Sl 202 Off-Ramp over EB Front Road Sl 202

Good

Maricopa County, Arizona · 3.11 MI E of JCT I 10 · Structure no. 02144

Built
1989
36 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
235 ft
3 main spans
Daily traffic
15,642
2022 count
Owner
State
State Highway Agency

About this bridge

Sl 202 Off-Ramp over EB Front Road Sl 202 is a prestressed concrete continuous box beam or girders - single or spread carrying Sl 202 Off-Ramp over EB Front Road Sl 202 in Maricopa County, Arizona. It was built in 1989, so it is 36 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,642 vehicles a day, roughly 7% of them trucks, projected to reach 15,652 by 2042. The structure is 235 ft (71.6 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSl 202 Off-Ramp
CrossesEB Front Road Sl 202
Location3.11 MI E of JCT I 10
RouteState Highway 202
StateArizona
Coordinates33.4582, -111.9891
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length235 ft (71.6 m)
Longest span130 ft (39.6 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,642 (2022)
Projected traffic15,652 by 2042
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sl 202 Off-Ramp over EB Front Road Sl 202 built?

It was built in 1989, making it 36 years old in 2025.

What condition is Sl 202 Off-Ramp over EB Front Road Sl 202 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Sl 202 Off-Ramp over EB Front Road Sl 202 carry?

About 15,642 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Sl 202 Off-Ramp over EB Front Road Sl 202?

The structure is 235 ft (71.6 m) long with a longest span of 130 ft (39.6 m) and a deck 39 ft wide.

Who owns Sl 202 Off-Ramp over EB Front Road Sl 202?

It is owned by the State Highway Agency.