WB 202 Off Ramp over 24th ST WB on Ramp
GoodMaricopa County, Arizona · 4.24 MI E of JCT I 17 · Structure no. 02115
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 350 ft
- 3 main spans
- Daily traffic
- 36,434
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
WB 202 Off Ramp over 24th ST WB on Ramp is a prestressed concrete continuous box beam or girders - single or spread carrying WB 202 Off Ramp over 24th ST WB on Ramp in Maricopa County, Arizona. It was built in 1989, so it is 36 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 36,434 vehicles a day, roughly 7% of them trucks, projected to reach 36,444 by 2041. The structure is 350 ft (106.7 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB 202 Off Ramp over 24th ST WB on Ramp built?
It was built in 1989, making it 36 years old in 2025.
What condition is WB 202 Off Ramp over 24th ST WB on Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does WB 202 Off Ramp over 24th ST WB on Ramp carry?
About 36,434 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is WB 202 Off Ramp over 24th ST WB on Ramp?
The structure is 350 ft (106.7 m) long with a longest span of 133 ft (40.5 m) and a deck 25 ft wide.
Who owns WB 202 Off Ramp over 24th ST WB on Ramp?
It is owned by the State Highway Agency.