US Bridges

Superst Sprgs Blvd over US 60

Good

Maricopa County, Arizona · 15.9 MI E JCT I-10 · Structure no. 02062

Built
1988
37 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
240 ft
2 main spans
Daily traffic
13,559
2022 count
Owner
State
State Highway Agency

About this bridge

Superst Sprgs Blvd over US 60 is a prestressed concrete continuous stringer/multi-beam or girder carrying Superst Sprgs Blvd over US 60 in Maricopa County, Arizona. It was built in 1988, so it is 37 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,559 vehicles a day, roughly 2% of them trucks, projected to reach 13,569 by 2042. The structure is 240 ft (73.2 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSuperst Sprgs Blvd
CrossesUS 60
Location15.9 MI E JCT I-10
RouteCity Street 0
StateArizona
Coordinates33.3863, -111.6936
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating65 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length240 ft (73.2 m)
Longest span118 ft (36 m)
Deck width85 ft (25.8 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,559 (2022)
Projected traffic13,569 by 2042
Trucks2%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Superst Sprgs Blvd over US 60 built?

It was built in 1988, making it 37 years old in 2025.

What condition is Superst Sprgs Blvd over US 60 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Superst Sprgs Blvd over US 60 carry?

About 13,559 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Superst Sprgs Blvd over US 60?

The structure is 240 ft (73.2 m) long with a longest span of 118 ft (36 m) and a deck 85 ft wide.

Who owns Superst Sprgs Blvd over US 60?

It is owned by the State Highway Agency.