US Bridges

IRR BIA RTE 242 over Wash

Good

Maricopa County, Arizona · 0.85 KM NW of Vq Casino · Structure no. 0000H57614B0818

Built
2022
3 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete Continuous
Length
30 ft
3 main spans
Daily traffic
5,000
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 242 over Wash is a concrete continuous culvert carrying IRR BIA RTE 242 over Wash in Maricopa County, Arizona. It was built in 2022, so it is 3 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 1% of them trucks, projected to reach 7,000 by 2033. The structure is 30 ft (9 m) long and 107 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesIRR BIA RTE 242
CrossesWash
Location0.85 KM NW of Vq Casino
RouteFederal Lands Road 242
StateArizona
Coordinates33.31614, -112.16233
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.9 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadUnknown
Structure length30 ft (9 m)
Longest span9 ft (2.7 m)
Deck width107 ft (32.6 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2023)
Projected traffic7,000 by 2033
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 242 over Wash built?

It was built in 2022, making it 3 years old in 2025.

What condition is IRR BIA RTE 242 over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does IRR BIA RTE 242 over Wash carry?

About 5,000 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is IRR BIA RTE 242 over Wash?

The structure is 30 ft (9 m) long with a longest span of 9 ft (2.7 m) and a deck 107 ft wide.

Who owns IRR BIA RTE 242 over Wash?

It is owned by the Bureau of Indian Affairs.