SR 75 over Sandia Wash
GoodGreenlee County, Arizona · 7.1 MI North of JCT US 70 · Structure no. 04357
- Built
- 1965
- 60 years old
- Condition
- Good
- inspected August 2021
- Type
- Culvert
- Concrete Continuous
- Length
- 21 ft
- 2 main spans
- Daily traffic
- 1,562
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 75 over Sandia Wash is a concrete continuous culvert carrying SR 75 over Sandia Wash in Greenlee County, Arizona. It was built in 1965, so it is 60 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,562 vehicles a day, roughly 17% of them trucks, projected to reach 1,572 by 2035. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 52.8 mi (85 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 75 over Sandia Wash built?
It was built in 1965, making it 60 years old in 2025.
What condition is SR 75 over Sandia Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2021.
How much traffic does SR 75 over Sandia Wash carry?
About 1,562 vehicles per day (2015 count), of which roughly 17% are trucks.
How long is SR 75 over Sandia Wash?
The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).
Who owns SR 75 over Sandia Wash?
It is owned by the State Highway Agency.