Pinewood Road over Munds Canyon Wash
GoodCoconino County, Arizona · 1.2 MI E JCT I-17 · Structure no. 09714
- Built
- 1980
- 45 years old, rebuilt 2015
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 77 ft
- 1 main span
- Daily traffic
- 2,710
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Pinewood Road over Munds Canyon Wash is a prestressed concrete stringer/multi-beam or girder carrying Pinewood Road over Munds Canyon Wash in Coconino County, Arizona. It was built in 1980 and reconstructed in 2015, so it is 45 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,710 vehicles a day, roughly 5% of them trucks, projected to reach 2,720 by 2042. The structure is 77 ft (23.5 m) long and 31 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pinewood Road over Munds Canyon Wash built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2015.
What condition is Pinewood Road over Munds Canyon Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Pinewood Road over Munds Canyon Wash carry?
About 2,710 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Pinewood Road over Munds Canyon Wash?
The structure is 77 ft (23.5 m) long with a longest span of 72 ft (21.9 m) and a deck 31 ft wide.
Who owns Pinewood Road over Munds Canyon Wash?
It is owned by the County Highway Agency.