IRR BIA RTE N123 over Wash
PoorApache County, Arizona · 1 MI N Hunters Point T.P. · Structure no. 00000000000N672
- Built
- 1990
- 35 years old
- Condition
- Poor
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 123
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE N123 over Wash is a steel continuous stringer/multi-beam or girder carrying IRR BIA RTE N123 over Wash in Apache County, Arizona. It was built in 1990, so it is 35 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 123 vehicles a day, roughly 10% of them trucks, projected to reach 144 by 2043. The structure is 153 ft (46.5 m) long and 31 ft wide. If it were closed, the detour would be 30.4 mi (49 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE N123 over Wash built?
It was built in 1990, making it 35 years old in 2025.
What condition is IRR BIA RTE N123 over Wash in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2023.
How much traffic does IRR BIA RTE N123 over Wash carry?
About 123 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is IRR BIA RTE N123 over Wash?
The structure is 153 ft (46.5 m) long with a longest span of 59 ft (18 m) and a deck 31 ft wide.
Who owns IRR BIA RTE N123 over Wash?
It is owned by the Bureau of Indian Affairs.