US Bridges

IRR BIA RTE N39 over Lone Tule Wash

PoorPosted for load

Apache County, Arizona · 6.2 MI N. Arizona HWY 264 · Structure no. 00000000000N641

Built
1959
66 years old, rebuilt 1983
Condition
Poor
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
35 ft
1 main span
Daily traffic
550
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE N39 over Lone Tule Wash is a steel stringer/multi-beam or girder carrying IRR BIA RTE N39 over Lone Tule Wash in Apache County, Arizona. It was built in 1959 and reconstructed in 1983, so it is 66 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for other load-capacity restriction.

It carries about 550 vehicles a day, roughly 1% of them trucks, projected to reach 631 by 2040. The structure is 35 ft (10.8 m) long and 17 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesIRR BIA RTE N39
CrossesLone Tule Wash
Location6.2 MI N. Arizona HWY 264
RouteFederal Lands Road 0N39
StateArizona
Coordinates35.78897, -109.47619
Functional classRural Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusPosted for other load-capacity restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating33 US tons
Inventory rating23.9 US tons

Structure

MaterialSteel
DeckOpen grating
Main spans1
Design loadUnknown
Structure length35 ft (10.8 m)
Longest span33 ft (10.1 m)
Deck width17 ft (5.1 m)
Roadway width16 ft (4.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2023)
Projected traffic631 by 2040
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$125,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE N39 over Lone Tule Wash built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1983.

What condition is IRR BIA RTE N39 over Lone Tule Wash in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2023.

How much traffic does IRR BIA RTE N39 over Lone Tule Wash carry?

About 550 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is IRR BIA RTE N39 over Lone Tule Wash?

The structure is 35 ft (10.8 m) long with a longest span of 33 ft (10.1 m) and a deck 17 ft wide.

Who owns IRR BIA RTE N39 over Lone Tule Wash?

It is owned by the Bureau of Indian Affairs.