Giles Road over Tanner Cr- Prairie Grove
FairWashington County, Arkansas · 0.42 Mi. N. SH 170 · Structure no. 000000000022472
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected October 2023
- Type
- Channel Beam
- Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 249
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Giles Road over Tanner Cr- Prairie Grove is a concrete channel beam carrying Giles Road over Tanner Cr- Prairie Grove in Washington County, Arkansas. It was built in 2002, so it is 23 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 249 vehicles a day, roughly 1% of them trucks, projected to reach 51 by 2007. The structure is 31 ft (9.4 m) long and 36 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Giles Road over Tanner Cr- Prairie Grove built?
It was built in 2002, making it 23 years old in 2025.
What condition is Giles Road over Tanner Cr- Prairie Grove in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Giles Road over Tanner Cr- Prairie Grove carry?
About 249 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Giles Road over Tanner Cr- Prairie Grove?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 36 ft wide.
Who owns Giles Road over Tanner Cr- Prairie Grove?
It is owned by the City or Municipal Highway Agency.