Don Tyson Parkway over I 49 - Section 28-WASH
GoodWashington County, Arkansas · 4.1 MI N JCT 71B-17B · Structure no. 000000000007255
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected September 2022
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 234 ft
- 2 main spans
- Daily traffic
- 6,700
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Don Tyson Parkway over I 49 - Section 28-WASH is a steel continuous stringer/multi-beam or girder carrying Don Tyson Parkway over I 49 - Section 28-WASH in Washington County, Arkansas. It was built in 2014, so it is 11 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,700 vehicles a day, roughly 1% of them trucks, projected to reach 9,300 by 2038. The structure is 234 ft (71.3 m) long and 77 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Don Tyson Parkway over I 49 - Section 28-WASH built?
It was built in 2014, making it 11 years old in 2025.
What condition is Don Tyson Parkway over I 49 - Section 28-WASH in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.
How much traffic does Don Tyson Parkway over I 49 - Section 28-WASH carry?
About 6,700 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Don Tyson Parkway over I 49 - Section 28-WASH?
The structure is 234 ft (71.3 m) long with a longest span of 116 ft (35.4 m) and a deck 77 ft wide.
Who owns Don Tyson Parkway over I 49 - Section 28-WASH?
It is owned by the State Highway Agency.