US Bridges

CR58 New London RD over Lapile Creek

Good

Union County, Arkansas · 0.55 MI NE JCT US 82 · Structure no. 000000000024314

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Channel Beam
Concrete
Length
279 ft
9 main spans
Daily traffic
540
2018 count
Owner
County
County Highway Agency

About this bridge

CR58 New London RD over Lapile Creek is a concrete channel beam carrying CR58 New London RD over Lapile Creek in Union County, Arkansas. It was built in 2023, so it is 2 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 540 vehicles a day, roughly 1% of them trucks, projected to reach 398 by 2007. The structure is 279 ft (85 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR58 New London RD
CrossesLapile Creek
Location0.55 MI NE JCT US 82
RouteCounty Highway 58
Coordinates33.11449, -92.34685
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating47 US tons
Inventory rating28 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans9
Design loadUnknown
Structure length279 ft (85 m)
Longest span31 ft (9.4 m)
Deck width25 ft (7.7 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic540 (2018)
Projected traffic398 by 2007
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR58 New London RD over Lapile Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is CR58 New London RD over Lapile Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does CR58 New London RD over Lapile Creek carry?

About 540 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is CR58 New London RD over Lapile Creek?

The structure is 279 ft (85 m) long with a longest span of 31 ft (9.4 m) and a deck 25 ft wide.

Who owns CR58 New London RD over Lapile Creek?

It is owned by the County Highway Agency.