US Bridges

U.S. Highway 71 NB over Hester Creek - Seb Co.

Fair

Sebastian County, Arkansas · 0.25 MI N JCT HWY 10 · Structure no. 0000000000B5194

Built
1996
29 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
182 ft
3 main spans
Daily traffic
13,500
2018 count
Owner
State
State Highway Agency

About this bridge

U.S. Highway 71 NB over Hester Creek - Seb Co. is a steel continuous stringer/multi-beam or girder carrying U.S. Highway 71 NB over Hester Creek - Seb Co. in Sebastian County, Arkansas. It was built in 1996, so it is 29 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,500 vehicles a day, roughly 6% of them trucks, projected to reach 14,500 by 2038. The structure is 182 ft (55.6 m) long and 41 ft wide.

CarriesU.S. Highway 71 NB
CrossesHester Creek - Seb Co.
Location0.25 MI N JCT HWY 10
RouteU.S. Route 71
Coordinates35.20684, -94.29229
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length182 ft (55.6 m)
Longest span60 ft (18.3 m)
Deck width41 ft (12.4 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,500 (2018)
Projected traffic14,500 by 2038
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. Highway 71 NB over Hester Creek - Seb Co. built?

It was built in 1996, making it 29 years old in 2025.

What condition is U.S. Highway 71 NB over Hester Creek - Seb Co. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does U.S. Highway 71 NB over Hester Creek - Seb Co. carry?

About 13,500 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is U.S. Highway 71 NB over Hester Creek - Seb Co.?

The structure is 182 ft (55.6 m) long with a longest span of 60 ft (18.3 m) and a deck 41 ft wide.

Who owns U.S. Highway 71 NB over Hester Creek - Seb Co.?

It is owned by the State Highway Agency.