I-540 Southbound over Phoenix Street - Seb Co.
FairSebastian County, Arkansas · 0.30 MI E of SH 45 · Structure no. 0000000000A5098
- Built
- 1968
- 57 years old, rebuilt 1988
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 159 ft
- 3 main spans
- Daily traffic
- 24,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
I-540 Southbound over Phoenix Street - Seb Co. is a steel stringer/multi-beam or girder carrying I-540 Southbound over Phoenix Street - Seb Co. in Sebastian County, Arkansas. It was built in 1968 and reconstructed in 1988, so it is 57 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,000 vehicles a day, roughly 1% of them trucks, projected to reach 30,970 by 2028. The structure is 159 ft (48.5 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-540 Southbound over Phoenix Street - Seb Co. built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1988.
What condition is I-540 Southbound over Phoenix Street - Seb Co. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does I-540 Southbound over Phoenix Street - Seb Co. carry?
About 24,000 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is I-540 Southbound over Phoenix Street - Seb Co.?
The structure is 159 ft (48.5 m) long with a longest span of 65 ft (19.8 m) and a deck 44 ft wide.
Who owns I-540 Southbound over Phoenix Street - Seb Co.?
It is owned by the State Highway Agency.