US Bridges

I 540-SEC 1 SB LN over Boston Street-Sebastian

Fair

Sebastian County, Arkansas · 0.22 MI S JCT SH 22 · Structure no. 0000000000A5096

Built
1968
57 years old, rebuilt 1988
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
153 ft
3 main spans
Daily traffic
27,581
2017 count
Owner
State
State Highway Agency

About this bridge

I 540-SEC 1 SB LN over Boston Street-Sebastian is a steel stringer/multi-beam or girder carrying I 540-SEC 1 SB LN over Boston Street-Sebastian in Sebastian County, Arkansas. It was built in 1968 and reconstructed in 1988, so it is 57 years old, older than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 27,581 vehicles a day, roughly 1% of them trucks, projected to reach 36,242 by 2028. The structure is 153 ft (46.6 m) long and 44 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesI 540-SEC 1 SB LN
CrossesBoston Street-Sebastian
Location0.22 MI S JCT SH 22
RouteInterstate 540
Coordinates35.35447, -94.36521
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length153 ft (46.6 m)
Longest span55 ft (16.8 m)
Deck width44 ft (13.5 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,581 (2017)
Projected traffic36,242 by 2028
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 540-SEC 1 SB LN over Boston Street-Sebastian built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1988.

What condition is I 540-SEC 1 SB LN over Boston Street-Sebastian in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does I 540-SEC 1 SB LN over Boston Street-Sebastian carry?

About 27,581 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is I 540-SEC 1 SB LN over Boston Street-Sebastian?

The structure is 153 ft (46.6 m) long with a longest span of 55 ft (16.8 m) and a deck 44 ft wide.

Who owns I 540-SEC 1 SB LN over Boston Street-Sebastian?

It is owned by the State Highway Agency.